IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0199 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,079 $1,080 Implemented
SF0199 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $1,583 $2,000 Implemented
SF0199 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,739 $36,345 Implemented
SF0199 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,178 $13,460 Implemented
WV0203 # 01 Y:2000 01 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $355 $953 Implemented
WV0203 # 02 Y:2000 02 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,005 $577 Implemented
WV0203 # 03 Y:2000 03 2000 REPAIR OR REPLACE STEAM TRAPS $735 $1,030 Implemented
WV0203 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,914 $535 Implemented
WV0203 # 05 Y:2000 05 2000 COVER OPEN TANKS $3,228 $1,336 Implemented
WV0203 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $233 $129 Not Implemented
WV0203 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $45 Implemented
WV0203 # 08 Y:2000 08 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $337 $222 Implemented
WV0203 # 09 Y:2000 09 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $18,899 $3,577 Not Implemented
WV0203 # 10 Y:2000 10 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $123,125 $120,000 Not Implemented
WV0203 # 11 Y:2000 11 2000 IMPROVE SPACE COMFORT CONDITIONING $6,500 $8,000 Not Implemented
WV0203 # 12 Y:2000 12 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $22,000 $4,000 Not Implemented
OR0370 # 01 Y:2000 01 2000 USE OPTIMUM TEMPERATURE $27,300 $0 Implemented
OR0370 # 02 Y:2000 02 2000 USE OPTIMUM TEMPERATURE $4,900 $650 Implemented
OR0370 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,673 $2,050 Implemented
OR0370 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,748 $1,909 Implemented
OR0370 # 05 Y:2000 05 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $92,680 $0 Implemented
OR0370 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,089 $12,821 Not Implemented
ME0296 # 01 Y:2000 01 2000 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $625,184 $1,387,500 Not Implemented
ME0296 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,377 $2,124 Not Implemented
ME0296 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,070 $4,700 Not Implemented