Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1702 # 14 Y:2017 | 14 | 2017 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,046 | $0 | Not Implemented |
OR0687 # 01 Y:2017 | 01 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,090 | $600 | Not Implemented |
OR0687 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $2,967 | $2,000 | Not Implemented |
OR0687 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $205,629 | $340,000 | Not Implemented |
OR0687 # 04 Y:2017 | 04 | 2017 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,195 | $5,650 | Not Implemented |
OR0687 # 05 Y:2017 | 05 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $6,460 | $16,124 | Not Implemented |
MZ0233 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,640 | $350 | Not Implemented |
MZ0233 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,041 | $34,350 | Not Implemented |
MZ0233 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $1,222 | Not Implemented |
MZ0233 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $605 | $0 | Not Implemented |
WM0106 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $68,853 | $480,000 | Not Implemented |
WM0106 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,721 | $49,500 | Not Implemented |
WM0106 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,613 | $11,130 | Not Implemented |
WM0106 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,352 | $3,278 | Implemented |
WM0106 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,204 | $0 | Implemented |
WM0106 # 06 Y:2017 | 06 | 2017 | USE SYNTHETIC LUBRICANT | $1,915 | $11,475 | Not Implemented |
WM0106 # 07 Y:2017 | 07 | 2017 | USE OPTIMUM TEMPERATURE | $1,605 | $0 | Implemented |
WM0106 # 08 Y:2017 | 08 | 2017 | USE RADIANT HEATER FOR SPOT HEATING | $2,133 | $3,818 | Implemented |
WM0106 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $1,138 | $600 | Implemented |
WM0106 # 10 Y:2017 | 10 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $416 | $800 | Not Implemented |
LE0441 # 01 Y:2017 | 01 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,712 | $20 | Not Implemented |
LE0441 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,114 | $20 | Implemented |
LE0441 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,738 | $1,000 | Implemented |
LE0441 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $57,323 | $15,000 | Not Implemented |
LE0441 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $831 | $1,000 | Not Implemented |