IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,413

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0204 # 01 Y:1986 01 1986 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $50,936 $300,000 Not Implemented
KU0204 # 02 Y:1986 02 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,720 $3,000 Not Implemented
KU0204 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $2,017 $1,600 Implemented
KU0204 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $1,220 $700 Implemented
KU0204 # 05 Y:1986 05 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $715 $0 Implemented
KU0204 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $335 $0 Implemented
KU0204 # 07 Y:1986 07 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $732 $30 Implemented
KU0204 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $50 Implemented
KU0204 # 09 Y:1986 09 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $155 $100 Implemented
KU0204 # 10 Y:1986 10 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $126 $0 Not Implemented
KU0205 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,437 $2,317 Implemented
KU0205 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,717 $1,000 Implemented
KU0205 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,773 $150 Implemented
KU0205 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $1,162 $615 Not Implemented
KU0205 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $1,085 $1,500 Not Implemented
KU0205 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $648 $0 Implemented
KU0205 # 07 Y:1986 07 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $396 $0 Not Implemented
MA0070 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,611 $0 Not Implemented
MA0070 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $200 Implemented
MA0070 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,470 $375 Implemented
MA0070 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,575 $5,300 Not Implemented
MA0070 # 05 Y:1986 05 1986 AIR CONDITION ONLY SPACE NECESSARY $1,072 $2,000 Not Implemented
LT0054 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,600 $20,000 Implemented
LT0054 # 02 Y:1986 02 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,100 $27,000 Not Implemented
LT0054 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $923 $700 Not Implemented