Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0247 # 07 Y:1988 | 07 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $390 | $705 | Implemented |
KU0248 # 01 Y:1988 | 01 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $20,271 | $2,500 | Implemented |
KU0248 # 02 Y:1988 | 02 | 1988 | RECOVER AND REUSE COOLING WATER | $19,728 | $9,000 | Implemented |
KU0248 # 03 Y:1988 | 03 | 1988 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,505 | $0 | Implemented |
KU0248 # 04 Y:1988 | 04 | 1988 | COVER OPEN TANKS | $2,897 | $600 | Implemented |
KU0248 # 05 Y:1988 | 05 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,471 | $150 | Implemented |
KU0248 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,843 | $2,961 | Implemented |
KU0248 # 07 Y:1988 | 07 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,435 | $267 | Not Implemented |
KU0248 # 08 Y:1988 | 08 | 1988 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $988 | $14 | Implemented |
KU0248 # 09 Y:1988 | 09 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $40 | Implemented |
KU0248 # 10 Y:1988 | 10 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $545 | $850 | Implemented |
KU0248 # 11 Y:1988 | 11 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $451 | $450 | Not Implemented |
KU0248 # 12 Y:1988 | 12 | 1988 | IMPROVE LUBRICATION PRACTICES | $275 | $0 | Implemented |
KU0248 # 13 Y:1988 | 13 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $176 | $0 | Implemented |
CO0115 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $34,100 | $7,000 | Implemented |
CO0115 # 02 Y:1988 | 02 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $112,791 | $80,000 | Not Implemented |
CO0115 # 03 Y:1988 | 03 | 1988 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $23,377 | $5,000 | Implemented |
CO0115 # 04 Y:1988 | 04 | 1988 | REDUCE EXCESS STEAM BLEEDING | $3,914 | $2,000 | Implemented |
CO0115 # 05 Y:1988 | 05 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,410 | $10,670 | Implemented |
CO0115 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,111 | $0 | Implemented |
CO0115 # 07 Y:1988 | 07 | 1988 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,557 | $38,200 | Implemented |
CO0116 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $151,329 | $7,000 | Implemented |
CO0116 # 02 Y:1988 | 02 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $753 | $18,000 | Implemented |
CO0116 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,758 | $0 | Implemented |
CO0116 # 04 Y:1988 | 04 | 1988 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,814 | $7,000 | Implemented |