IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0331 # 08 Y:2002 08 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $89,018 $19,710 Implemented
AS0331 # 09 Y:2002 09 2002 PAY BILLS ON TIME TO AVOID LATE FEES $819 $144 Implemented
AS0330 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,018 $3,240 Not Implemented
AS0330 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $3,673 Not Implemented
AS0330 # 03 Y:2002 03 2002 INSTALL SKYLIGHTS $1,360 $5,352 Not Implemented
AS0330 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $230 $975 Not Implemented
AS0330 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $256 $60 Not Implemented
AS0330 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $832 $60 Not Implemented
AS0330 # 07 Y:2002 07 2002 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $259 $65 Not Implemented
AS0330 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,186 $8,988 Not Implemented
AS0329 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,200 $13,655 Not Implemented
AS0329 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $615 $1,500 Not Implemented
AS0329 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,444 $43,930 Not Implemented
AS0329 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94 $48 Not Implemented
AS0329 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $737 Implemented
AS0328 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $4,422 Implemented
AS0328 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $160 $375 Not Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented
AS0328 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,442 $737 Implemented
AS0328 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,487 $2,091 Implemented
AS0328 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,223 $9,800 Implemented
AS0328 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $721 $1,200 Not Implemented
AS0328 # 08 Y:2002 08 2002 MINIMIZE WATER USAGE $663 $3,000 Not Implemented
AS0327 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,614 $200 Implemented
AS0327 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,154 $10,992 Not Implemented