Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0352 # 09 Y:2009 | 09 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,944 | $1,200 | Implemented |
UM0351 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,050 | $0 | Implemented |
UM0351 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,706 | $19,921 | Implemented |
UM0351 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,516 | $100 | Not Implemented |
UM0351 # 04 Y:2009 | 04 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,124 | $2,800 | Not Implemented |
UM0351 # 05 Y:2009 | 05 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,656 | $500 | Implemented |
UM0351 # 06 Y:2009 | 06 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,506 | $1,660 | Not Implemented |
UM0350 # 01 Y:2009 | 01 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,346 | $12,800 | Not Implemented |
UM0350 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,487 | $13,000 | Implemented |
UM0350 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,300 | $1,500 | Not Implemented |
UM0350 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,744 | $30,000 | Implemented |
UM0350 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,990 | $100 | Not Implemented |
UM0350 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,186 | $10,960 | Not Implemented |
UM0350 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $846 | $474 | Not Implemented |
UM0350 # 08 Y:2009 | 08 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $649 | $1,200 | Implemented |
UM0348 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $56,000 | $6,000 | Implemented |
UM0348 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $51,000 | $3,000 | Implemented |
UM0348 # 03 Y:2009 | 03 | 2009 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $30,000 | $62,000 | Not Implemented |
UM0348 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,700 | $12,400 | Not Implemented |
UM0348 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,200 | $35,689 | Implemented |
UM0348 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,900 | $200 | Implemented |
UM0348 # 07 Y:2009 | 07 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $6,200 | $15,000 | Implemented |
UM0348 # 08 Y:2009 | 08 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,300 | $3,900 | Not Implemented |
UM0348 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $3,400 | $7,400 | Not Implemented |
UM0346 # 01 Y:2008 | 01 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,849 | $500 | Not Implemented |