IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0774 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $0 Implemented
OK0774 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $365 $1,154 Implemented
OK0774 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,891 Not Implemented
OK0774 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $5,760 Not Implemented
OK0774 # 06 Y:2009 06 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $400 $0 Not Implemented
OK0773 # 01 Y:2009 01 2009 OPERATE BOILERS ON HIGH FIRE SETTING $14,770 $22,000 Not Implemented
OK0773 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $0 Implemented
OK0773 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $36,076 $2,450 Implemented
OK0773 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $1,554 $1,284 Implemented
OK0773 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $1,887 Implemented
OK0773 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81 $425 Implemented
OK0772 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,160 $0 Implemented
OK0772 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,160 $0 Implemented
OK0772 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,094 $353 Not Implemented
OK0772 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,498 $2,767 Not Implemented
OK0772 # 05 Y:2009 05 2009 OPERATE BOILERS ON HIGH FIRE SETTING $4,261 $17,500 Implemented
OK0772 # 06 Y:2009 06 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $400 $0 Not Implemented
OK0772 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,532 $2,954 Implemented
OK0772 # 08 Y:2009 08 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,295 $953 Not Implemented
OK0771 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,463 $846 Not Implemented
OK0771 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,125 $3,460 Not Implemented
OK0771 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,458 $0 Not Implemented
OK0771 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,066 $0 Not Implemented
OK0771 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,875 Not Implemented
OK0771 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $284 $1,213 Not Implemented