Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0228 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,117 | $720 | Implemented |
WV0228 # 03 Y:2001 | 03 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,376 | $2,400 | Implemented |
WV0228 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $187 | $98 | Implemented |
WV0228 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $1,245 | Implemented |
WV0228 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $60 | Implemented |
WV0228 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $147 | $320 | Not Implemented |
WV0228 # 08 Y:2001 | 08 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,128 | $1,200 | Implemented |
WV0228 # 09 Y:2001 | 09 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,975 | $5,660 | Not Implemented |
WV0228 # 10 Y:2001 | 10 | 2001 | BURN WASTE OIL FOR HEAT | $318 | $953 | Not Implemented |
WV0228 # 11 Y:2001 | 11 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $850 | $2,547 | Implemented |
WV0228 # 12 Y:2001 | 12 | 2001 | ADJUST PH FOR NEUTRALIZATION | $11,300 | $13,000 | Not Implemented |
WV0228 # 13 Y:2001 | 13 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $110,000 | $858,000 | Not Implemented |
WV0227 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,919 | $750 | Implemented |
WV0227 # 02 Y:2001 | 02 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,589 | $1,980 | Not Implemented |
WV0227 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $913 | $100 | Implemented |
WV0227 # 04 Y:2001 | 04 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $704 | $50 | Not Implemented |
WV0227 # 05 Y:2001 | 05 | 2001 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $603 | $390 | Implemented |
WV0227 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $275 | $112 | Implemented |
WV0227 # 07 Y:2001 | 07 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $31,855 | $2,000 | Implemented |
WV0227 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,200 | $1,000 | Implemented |
WV0227 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,150 | $2,910 | Implemented |
WV0227 # 10 Y:2001 | 10 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,267 | $3,000 | Not Implemented |
WV0227 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,814 | $100 | Implemented |
WV0227 # 12 Y:2001 | 12 | 2001 | ADJUST PH FOR NEUTRALIZATION | $8,625 | $13,725 | Not Implemented |
WV0227 # 13 Y:2001 | 13 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,200 | $75 | Implemented |