IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0185 # 07 Y:1990 07 1990 OPTIMIZE PLANT POWER FACTOR $6,200 $7,400 Not Implemented
GT0406 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $2,430 Not Implemented
AM0094 # 01 Y:1990 01 1990 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $31,894 $22,000 Implemented
AM0094 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $8,700 $450 Implemented
AM0094 # 03 Y:1990 03 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,807 $7,920 Implemented
AM0094 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,870 $3,160 Implemented
AM0094 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,260 $675 Implemented
AM0094 # 06 Y:1990 06 1990 IMPROVE LUBRICATION PRACTICES $670 $0 Implemented
AM0094 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $500 Implemented
AM0094 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $580 $270 Implemented
AM0094 # 09 Y:1990 09 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $260 $0 Implemented
AM0095 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $75,970 $37,000 Not Implemented
AM0095 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,400 $101,400 Not Implemented
AM0095 # 03 Y:1990 03 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $9,335 $17,000 Not Implemented
AM0095 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,505 $600 Not Implemented
AM0095 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $2,745 $7,875 Not Implemented
AM0095 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $2,256 $4,050 Not Implemented
AM0095 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $1,760 $0 Not Implemented
AM0095 # 09 Y:1990 09 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,185 $425 Not Implemented
AM0095 # 10 Y:1990 10 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $60 Not Implemented
AS0003 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,285 $1,622 Not Implemented
AS0003 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $2,943 Implemented
AS0003 # 03 Y:1990 03 1990 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,500 $7,500 Not Implemented
AM0088 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,652 $1,920 Not Implemented
AM0088 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $869 $520 Not Implemented