Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,666
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0390 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,075 | $0 | Not Implemented |
NC0390 # 04 Y:2009 | 04 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,533 | $50 | Implemented |
NC0390 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $379 | $432 | Not Implemented |
NC0390 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,223 | $50,369 | Not Implemented |
LE0286 # 01 Y:2009 | 01 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $20,166 | $9,360 | Not Implemented |
LE0286 # 02 Y:2009 | 02 | 2009 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $15,000 | $40,000 | Not Implemented |
LE0286 # 03 Y:2009 | 03 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,875 | $10,000 | Not Implemented |
LE0286 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,170 | $1,152 | Not Implemented |
LE0286 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,022 | $800 | Not Implemented |
LE0286 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,998 | $192 | Implemented |
LE0286 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,833 | $350 | Implemented |
LE0286 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,174 | $100 | Implemented |
LE0286 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,921 | $25,494 | Implemented |
MZ0034 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,217 | $1,000 | Implemented |
MZ0034 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $625 | $650 | Implemented |
MZ0034 # 03 Y:2009 | 03 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,996 | $0 | Implemented |
MZ0034 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,188 | $32,000 | Implemented |
MZ0034 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $5,200 | $532 | Implemented |
MZ0034 # 06 Y:2009 | 06 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,780 | $3,000 | Not Implemented |
MZ0034 # 07 Y:2009 | 07 | 2009 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $13,376 | $20,000 | Implemented |
OK0777 # 01 Y:2009 | 01 | 2009 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $164,328 | $490,000 | Implemented |
OK0777 # 02 Y:2009 | 02 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $26,234 | $0 | Implemented |
OK0777 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,889 | $19,448 | Not Implemented |
OK0777 # 04 Y:2009 | 04 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,136 | $3,129 | Implemented |
OK0777 # 05 Y:2009 | 05 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $28,753 | $33,300 | Implemented |