IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0128 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,032 $90,880 Implemented
MZ0128 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,584 $0 Implemented
MZ0128 # 03 Y:2013 03 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,679 $0 Not Implemented
MZ0128 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $400 Implemented
MZ0128 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,891 $1,160 Implemented
MZ0128 # 06 Y:2013 06 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,045 $150 Implemented
MZ0128 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $218 $190 Implemented
MZ0128 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $1,000 Implemented
MZ0128 # 09 Y:2013 09 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $717 $2,000 Implemented
OR0611 # 01 Y:2013 01 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,437 $0 Not Implemented
OR0611 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $8,684 $5,600 Not Implemented
OR0611 # 03 Y:2013 03 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,909 $37,830 Not Implemented
OR0611 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $5,340 $11,938 Not Implemented
OR0611 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $2,436 $2,159 Not Implemented
OR0611 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,410 $3,724 Not Implemented
OR0611 # 07 Y:2013 07 2013 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $1,200 $5,464 Not Implemented
OR0611 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $922 $2,134 Not Implemented
UA0106 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,561 $600 Not Implemented
UA0106 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,770 $91,630 Not Implemented
UA0106 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,514 $100,000 Not Implemented
UA0106 # 04 Y:2013 04 2013 USE OPTIMUM THICKNESS INSULATION $17,964 $9,249 Not Implemented
NC0491 # 01 Y:2013 01 2013 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $13,288 $25,000 Not Implemented
NC0491 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,220 $31,024 Not Implemented
NC0491 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $4,950 Not Implemented
NC0491 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,591 $10,980 Not Implemented