Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,717
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0322 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $806 | $1,500 | Implemented |
TN0322 # 02 Y:1987 | 02 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $9,054 | $6,400 | Implemented |
TN0322 # 03 Y:1987 | 03 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,634 | $12,750 | Implemented |
TN0322 # 04 Y:1987 | 04 | 1987 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,952 | $0 | Not Implemented |
TN0322 # 05 Y:1987 | 05 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,269 | $1,125 | Implemented |
TN0322 # 06 Y:1987 | 06 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $774 | $40 | Implemented |
TN0322 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $735 | Implemented |
UD0245 # 01 Y:1988 | 01 | 1988 | INSULATE BARE EQUIPMENT | $5,160 | $500 | Implemented |
UD0245 # 02 Y:1988 | 02 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,498 | $1,600 | Implemented |
UD0245 # 03 Y:1988 | 03 | 1988 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $329 | $425 | Implemented |
UD0245 # 04 Y:1988 | 04 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,625 | $6,000 | Not Implemented |
UD0246 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,261 | $0 | Implemented |
UD0246 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,946 | $100,000 | Implemented |
UD0246 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,694 | $32,400 | Implemented |
UD0246 # 05 Y:1988 | 05 | 1988 | INSULATE BARE EQUIPMENT | $4,414 | $3,400 | Implemented |
UD0246 # 06 Y:1988 | 06 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,171 | $4,000 | Not Implemented |
KU0237 # 01 Y:1987 | 01 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,838 | $600 | Not Implemented |
KU0237 # 02 Y:1987 | 02 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $399 | $250 | Not Implemented |
KU0237 # 03 Y:1987 | 03 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,921 | $2,000 | Not Implemented |
KU0237 # 04 Y:1987 | 04 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $407 | $250 | Implemented |
KU0237 # 05 Y:1987 | 05 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $313 | $250 | Not Implemented |
KU0237 # 06 Y:1987 | 06 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,203 | $200 | Implemented |
KU0237 # 07 Y:1987 | 07 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $390 | $40 | Not Implemented |
KU0237 # 08 Y:1987 | 08 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $519 | $0 | Implemented |
KU0237 # 09 Y:1987 | 09 | 1987 | IMPROVE LUBRICATION PRACTICES | $597 | $0 | Not Implemented |