IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0408 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,702 $57,000 Not Implemented
BD0408 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,937 $1,500 Implemented
BD0408 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,611 $50 Not Implemented
BD0408 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,622 $4,000 Implemented
BD0408 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $154 $20 Implemented
BD0408 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $975 $400 Implemented
BD0407 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,152 $4,550 Implemented
BD0407 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,651 $2,474 Implemented
BD0407 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,441 $1,125 Not Implemented
BD0407 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,629 $10 Not Implemented
BD0407 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,259 $1,420 Not Implemented
BD0407 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $281 $300 Not Implemented
BD0406 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,639 $4,573 Not Implemented
BD0406 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $15,397 $800 Not Implemented
BD0406 # 03 Y:2012 03 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,730 $10,000 Not Implemented
BD0406 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,394 $3,000 Implemented
BD0406 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,151 $7,591 Not Implemented
BD0406 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,404 $500 Implemented
BD0406 # 07 Y:2012 07 2012 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,394 $9,400 Not Implemented
BD0406 # 08 Y:2012 08 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,126 $3,350 Not Implemented
BD0406 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,962 $2,736 Not Implemented
BD0406 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $1,808 $1,350 Implemented
BD0406 # 11 Y:2012 11 2012 INSTALL TURBULATORS $772 $1,500 Implemented
BD0406 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $434 $150 Not Implemented
BD0406 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $254 $10 Implemented