Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0017 # 04 Y:2008 | 04 | 2008 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $6,100 | $12,100 | Not Implemented |
DL0017 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,006 | $26,496 | Implemented |
DL0017 # 06 Y:2008 | 06 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,572 | $165,000 | Not Implemented |
MA0639 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $78,761 | $65,000 | Not Implemented |
MA0639 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,993 | $70,840 | Implemented |
MA0639 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,064 | $17,800 | Not Implemented |
MA0639 # 04 Y:2008 | 04 | 2008 | REDUCE VENTILATION AIR | $16,180 | $0 | Not Implemented |
MA0639 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,735 | $15,500 | Not Implemented |
MA0639 # 06 Y:2008 | 06 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $12,707 | $975 | Implemented |
MA0639 # 07 Y:2008 | 07 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,426 | $27,000 | Implemented |
MA0639 # 08 Y:2008 | 08 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $717 | $1,000 | Not Implemented |
MA0639 # 09 Y:2008 | 09 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $716 | $0 | Not Implemented |
MA0639 # 10 Y:2008 | 10 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $2,000 | Implemented |
MZ0021 # 01 Y:2008 | 01 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,665 | $20,000 | Implemented |
MZ0021 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,575 | $900 | Implemented |
MZ0021 # 03 Y:2008 | 03 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $5,000 | Implemented |
MZ0021 # 04 Y:2008 | 04 | 2008 | INSTALL SPECTRAL REFLECTORS / DELAMP | $565 | $40 | Implemented |
MZ0021 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,112 | $21,425 | Implemented |
MZ0021 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $855 | $740 | Not Implemented |
MZ0021 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $40 | $190 | Not Implemented |
MI0168 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $256,906 | $645,000 | Not Implemented |
MI0168 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $60,893 | $2,040 | Implemented |
MI0168 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,290 | $43,681 | Implemented |
MI0168 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0168 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |