Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,693
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0305 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,192 | $6,512 | Implemented |
GT0305 # 03 Y:1986 | 03 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,049 | $2,100 | Implemented |
GT0305 # 04 Y:1986 | 04 | 1986 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $9,350 | $0 | Implemented |
GT0305 # 05 Y:1986 | 05 | 1986 | ADJUST VENTS TO MINIMIZE ENERGY USE | $3,652 | $1,000 | Not Implemented |
GT0305 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,580 | $0 | Implemented |
GT0305 # 07 Y:1986 | 07 | 1986 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $24,800 | $49,200 | Not Implemented |
GT0305 # 08 Y:1986 | 08 | 1986 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $4,400 | $1,000 | Implemented |
UD0216 # 01 Y:1987 | 01 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,112 | $2,000 | Implemented |
UD0216 # 02 Y:1987 | 02 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,598 | $2,500 | Implemented |
UD0216 # 03 Y:1987 | 03 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,753 | $8,000 | Implemented |
UD0216 # 04 Y:1987 | 04 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,497 | $17,500 | Implemented |
UD0216 # 05 Y:1987 | 05 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,656 | $4,756 | Implemented |
UD0217 # 01 Y:1987 | 01 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,538 | $5,000 | Implemented |
UD0217 # 02 Y:1987 | 02 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,993 | $20,000 | Implemented |
UD0217 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,444 | $1,000 | Implemented |
UD0217 # 04 Y:1987 | 04 | 1987 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,387 | $50,000 | Not Implemented |
UD0218 # 01 Y:1987 | 01 | 1987 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,049 | $5,470 | Implemented |
UD0218 # 02 Y:1987 | 02 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,039 | $9,500 | Not Implemented |
UD0218 # 03 Y:1987 | 03 | 1987 | TURN OFF EQUIPMENT WHEN NOT IN USE | $463 | $129 | Not Implemented |
UD0218 # 04 Y:1987 | 04 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,481 | $0 | Implemented |
TN0293 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $625 | $180 | Implemented |
TN0293 # 08 Y:1986 | 08 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,279 | $300 | Not Implemented |
TN0294 # 01 Y:1986 | 01 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $10,135 | $2,675 | Implemented |
TN0294 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,406 | $195 | Implemented |
TN0294 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $797 | $941 | Implemented |