Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164,670
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0084 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $0 | Not Implemented |
LT0084 # 04 Y:1987 | 04 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,200 | $1,200 | Implemented |
LT0084 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,656 | $1,300 | Implemented |
LT0084 # 06 Y:1987 | 06 | 1987 | KEEP BOILER TUBES CLEAN | $2,900 | $3,000 | Not Implemented |
LT0084 # 07 Y:1987 | 07 | 1987 | INSULATE BARE EQUIPMENT | $2,160 | $6,300 | Implemented |
LT0084 # 08 Y:1987 | 08 | 1987 | INSULATE BARE EQUIPMENT | $71,905 | $5,420 | Implemented |
RU0001 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,628 | $376 | Implemented |
RU0001 # 02 Y:1987 | 02 | 1987 | COVER OPEN TANKS | $3,290 | $200 | Not Implemented |
RU0001 # 03 Y:1987 | 03 | 1987 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $822 | $31 | Implemented |
RU0001 # 04 Y:1987 | 04 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,104 | $0 | Implemented |
RU0001 # 05 Y:1987 | 05 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,551 | $0 | Implemented |
RU0002 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $22,514 | $0 | Implemented |
RU0002 # 02 Y:1987 | 02 | 1987 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $30,280 | $32,000 | Implemented |
RU0002 # 03 Y:1987 | 03 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,433 | $5,670 | Implemented |
RU0002 # 04 Y:1987 | 04 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,800 | $178 | Implemented |
RU0002 # 05 Y:1987 | 05 | 1987 | INSULATE BARE EQUIPMENT | $9,437 | $6,204 | Not Implemented |
RU0002 # 06 Y:1987 | 06 | 1987 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,751 | $0 | Implemented |
KU0219 # 01 Y:1987 | 01 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,778 | $2,698 | Implemented |
KU0219 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,013 | $3,814 | Not Implemented |
KU0219 # 03 Y:1987 | 03 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $1,516 | $100 | Implemented |
KU0219 # 04 Y:1987 | 04 | 1987 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $498 | $1,012 | Implemented |
KU0219 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $181 | $400 | Implemented |
KU0219 # 06 Y:1987 | 06 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $351 | $400 | Not Implemented |
KU0219 # 07 Y:1987 | 07 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $109 | $0 | Implemented |
KU0220 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,362 | $3,200 | Implemented |