IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0330 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $5,537 $7,669 Implemented
MI0330 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,299 $2,670 Implemented
MI0330 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,223 $7,807 Implemented
MI0330 # 09 Y:2018 09 2018 INSULATE BARE EQUIPMENT $1,778 $1,722 Not Implemented
MI0330 # 10 Y:2018 10 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,190 $1,160 Not Implemented
MI0330 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $794 $1,833 Implemented
MI0330 # 12 Y:2018 12 2018 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $608 $756 Implemented
UF0515 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $293,173 $1,270,000 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
MI0328 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,062 $127,500 Not Implemented
MI0328 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,847 $63,840 Implemented
MI0328 # 03 Y:2018 03 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,041 $25,680 Not Implemented
MI0328 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,135 $1,660 Implemented
MI0328 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,680 $40 Implemented
MI0328 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,307 $13,190 Implemented
MI0328 # 07 Y:2018 07 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,824 $5,032 Implemented
MI0328 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $2,086 $5,544 Implemented
MI0328 # 09 Y:2018 09 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,121 $1,501 Implemented
MI0328 # 10 Y:2018 10 2018 USE PHOTOCELL CONTROLS $1,016 $2,773 Implemented
MI0328 # 11 Y:2018 11 2018 INSULATE BARE EQUIPMENT $1,011 $206 Not Implemented
MI0327 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,286 $68,000 Not Implemented