IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0425 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,306 $4,600 Not Implemented
NC0425 # 12 Y:2011 12 2011 DEVELOP STANDARD OPERATING PROCEDURES $6,300 $3,000 Not Implemented
NC0424 # 01 Y:2011 01 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $51,507 $142,273 Not Implemented
NC0424 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,681 $112,768 Implemented
NC0424 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $4,435 Implemented
NC0424 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,685 $78,795 Implemented
NC0424 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,791 $100 Implemented
NC0424 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $27,638 $74,990 Not Implemented
NC0422 # 01 Y:2011 01 2011 ADJUST BURNERS FOR EFFICIENT OPERATION $3,623 $1,000 Not Implemented
NC0422 # 02 Y:2011 02 2011 REPLACE BOILER $17,336 $37,000 Not Implemented
NC0422 # 03 Y:2011 03 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $15,021 $10,000 Not Implemented
NC0422 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,316 $1,618 Not Implemented
NC0422 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,982 $38,000 Not Implemented
NC0422 # 06 Y:2011 06 2011 COVER OPEN TANKS $11,237 $15,000 Not Implemented
NC0422 # 07 Y:2011 07 2011 UPGRADE CONTROLS ON COMPRESSORS $15,795 $1,500 Not Implemented
NC0422 # 08 Y:2011 08 2011 RECOVER WASTE HEAT FROM EQUIPMENT $10,815 $22,930 Not Implemented
NC0422 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,211 $100 Not Implemented
NC0422 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,027 $100 Not Implemented
NC0422 # 11 Y:2011 11 2011 PAY UTILITY BILLS ON TIME $3,586 $0 Not Implemented
NC0421 # 01 Y:2011 01 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $28,591 $51,300 Not Implemented
NC0421 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,751 $25,000 Not Implemented
NC0421 # 03 Y:2011 03 2011 REPAIR OR REPLACE STEAM TRAPS $12,484 $5,500 Implemented
NC0421 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,180 $25,000 Not Implemented
NC0421 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,844 $100 Implemented
NC0421 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $9,751 $20,768 Implemented