Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,232
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0158 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,260 | Implemented |
UD0158 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $434 | $280 | Implemented |
UD0158 # 03 Y:1985 | 03 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,850 | $18,000 | Not Implemented |
UD0158 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $240 | Implemented |
UD0160 # 01 Y:1985 | 01 | 1985 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $26,076 | $20,000 | Implemented |
UD0160 # 02 Y:1985 | 02 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,657 | $2,000 | Implemented |
UD0160 # 03 Y:1985 | 03 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,357 | $1,400 | Implemented |
UD0160 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $200 | Implemented |
UD0160 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,689 | $0 | Implemented |
UD0160 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,825 | $551 | Implemented |
UD0160 # 07 Y:1985 | 07 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,401 | $7,500 | Implemented |
TS0021 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $844 | $326 | Not Implemented |
TS0021 # 02 Y:1985 | 02 | 1985 | INSTALL SET-BACK TIMERS | $624 | $700 | Not Implemented |
TS0021 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,093 | $4,800 | Not Implemented |
TS0021 # 04 Y:1985 | 04 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $633 | $300 | Not Implemented |
TS0021 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,178 | $150 | Not Implemented |
TS0022 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,270 | $5,000 | Not Implemented |
TS0022 # 02 Y:1985 | 02 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $595 | $0 | Not Implemented |
TS0022 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,325 | $480 | Not Implemented |
TS0022 # 04 Y:1985 | 04 | 1985 | INSTALL SET-BACK TIMERS | $2,580 | $1,000 | Not Implemented |
TS0022 # 05 Y:1985 | 05 | 1985 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $10,224 | $3,000 | Not Implemented |
TN0245 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,632 | $232 | Implemented |
TN0245 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,837 | $0 | Implemented |
TN0245 # 03 Y:1985 | 03 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,185 | $0 | Implemented |
TN0245 # 04 Y:1985 | 04 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,176 | $400 | Not Implemented |