IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,464

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0024 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,502 $3,500 Not Implemented
OK0024 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $80 Not Implemented
OK0024 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,135 $0 Implemented
OK0024 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386 $90 Not Implemented
OK0029 # 01 Y:1982 01 1982 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,489 $0 Not Implemented
OK0029 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,887 $18,833 Not Implemented
OK0029 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,789 $510 Not Implemented
OK0029 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,390 $1,124 Not Implemented
OK0029 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $993 $630 Not Implemented
OK0031 # 01 Y:1982 01 1982 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $110,300 $405,000 Not Implemented
OK0031 # 02 Y:1982 02 1982 USE RADIANT HEATER FOR SPOT HEATING $927 $1,665 Not Implemented
OK0031 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $1,950 $6,385 Not Implemented
OK0031 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,109 $280 Implemented
OK0032 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,217 $120 Not Implemented
OK0032 # 02 Y:1982 02 1982 INSTALL SET-BACK TIMERS $46 $0 Not Implemented
OK0032 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $170 Not Implemented
OK0032 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $168 $400 Not Implemented
KU0034 # 01 Y:1982 01 1982 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,130 $6,000 Not Implemented
KU0034 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,770 $3,635 Not Implemented
KU0034 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,680 $0 Not Implemented
KU0034 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,240 $1,600 Not Implemented
KU0034 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $450 $869 Not Implemented
KU0034 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $700 Not Implemented
KU0034 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $695 $600 Not Implemented
KU0035 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,065 $36,000 Not Implemented