Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,774
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0098 # 08 Y:1983 | 08 | 1983 | AIR CONDITION ONLY SPACE NECESSARY | $4,385 | $0 | Not Implemented |
KU0098 # 09 Y:1983 | 09 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $360 | $252 | Not Implemented |
KU0098 # 10 Y:1983 | 10 | 1983 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,750 | $7,400 | Not Implemented |
KU0098 # 11 Y:1983 | 11 | 1983 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,711 | $0 | Not Implemented |
KU0098 # 12 Y:1983 | 12 | 1983 | INSTALL SET-BACK TIMERS | $2,264 | $0 | Not Implemented |
KU0099 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,778 | $2,585 | Implemented |
KU0099 # 02 Y:1983 | 02 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $935 | $2,350 | Implemented |
KU0099 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $628 | $660 | Implemented |
KU0099 # 04 Y:1983 | 04 | 1983 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $544 | $0 | Implemented |
KU0100 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,005 | $4,164 | Not Implemented |
KU0100 # 02 Y:1983 | 02 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,578 | $10,000 | Not Implemented |
KU0100 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,770 | $2,400 | Not Implemented |
KU0100 # 04 Y:1983 | 04 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,967 | $10,000 | Not Implemented |
KU0100 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $41,200 | $41,500 | Not Implemented |
GT0192 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,025 | $2,450 | Not Implemented |
GT0192 # 02 Y:1983 | 02 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $537 | $800 | Not Implemented |
GT0192 # 03 Y:1983 | 03 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $130 | $80 | Not Implemented |
GT0199 # 01 Y:1983 | 01 | 1983 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,320 | $6,100 | Implemented |
GT0199 # 02 Y:1983 | 02 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,149 | $2,491 | Not Implemented |
GT0199 # 03 Y:1983 | 03 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $75 | Implemented |
GT0184 # 01 Y:1983 | 01 | 1983 | KEEP BOILER TUBES CLEAN | $1,560 | $1,500 | Implemented |
GT0184 # 02 Y:1983 | 02 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,600 | $4,530 | Implemented |
GT0184 # 03 Y:1983 | 03 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,470 | $2,400 | Implemented |
GT0184 # 04 Y:1983 | 04 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,100 | $6,000 | Implemented |
GT0184 # 05 Y:1983 | 05 | 1983 | INSULATE BARE EQUIPMENT | $2,600 | $4,580 | Implemented |