IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0124 # 10 Y:1984 10 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $501 $323 Implemented
KU0124 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $542 $1,600 Implemented
KU0124 # 12 Y:1984 12 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,644 $140 Not Implemented
KU0124 # 13 Y:1984 13 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,322 $1,800 Implemented
KU0124 # 14 Y:1984 14 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,965 $1,000 Not Implemented
KU0124 # 15 Y:1984 15 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $886 $800 Implemented
KU0124 # 16 Y:1984 16 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $300 Implemented
KU0124 # 17 Y:1984 17 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $655 $0 Implemented
KU0124 # 18 Y:1984 18 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $616 $1,200 Not Implemented
KU0124 # 19 Y:1984 19 1984 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,000 $0 Implemented
KU0121 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $8,835 $0 Implemented
KU0121 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $376 $200 Not Implemented
KU0121 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,383 $2,250 Implemented
KU0121 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $3,959 $1,000 Implemented
KU0121 # 05 Y:1984 05 1984 COVER OPEN TANKS $2,396 $4,000 Not Implemented
KU0121 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,034 $738 Implemented
KU0121 # 07 Y:1984 07 1984 USE MINIMUM SAFE OVEN VENTILATION $474 $0 Implemented
KU0121 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,132 $0 Not Implemented
KU0121 # 09 Y:1984 09 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $835 $1,200 Implemented
KU0121 # 10 Y:1984 10 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $447 $215 Not Implemented
KU0121 # 11 Y:1984 11 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $100 Implemented
KU0121 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Not Implemented
KU0122 # 01 Y:1984 01 1984 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $9,129 $5,400 Not Implemented
KU0122 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,060 $5,000 Implemented
KU0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,649 $3,690 Implemented