Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0110 # 04 Y:1983 | 04 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $465 | $3,000 | Implemented |
KU0110 # 05 Y:1983 | 05 | 1983 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $200 | $0 | Not Implemented |
KU0110 # 06 Y:1983 | 06 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $445 | $200 | Not Implemented |
KU0110 # 07 Y:1983 | 07 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $162 | $0 | Not Implemented |
KU0110 # 08 Y:1983 | 08 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $162 | $0 | Not Implemented |
KU0111 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $358 | $600 | Not Implemented |
KU0111 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $272 | $391 | Not Implemented |
KU0111 # 03 Y:1983 | 03 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $246 | $400 | Not Implemented |
KU0111 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $214 | $200 | Implemented |
KU0111 # 05 Y:1983 | 05 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $564 | $438 | Not Implemented |
KU0111 # 06 Y:1983 | 06 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $214 | $0 | Not Implemented |
GT0200 # 01 Y:1983 | 01 | 1983 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $373,500 | $220,000 | Not Implemented |
GT0200 # 02 Y:1983 | 02 | 1983 | MODIFY DYE BECK | $36,666 | $41,000 | Not Implemented |
GT0200 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,660 | $30,000 | Not Implemented |
GT0200 # 04 Y:1983 | 04 | 1983 | MODIFY TEXTILE DRYERS | $46,800 | $55,000 | Not Implemented |
GT0200 # 05 Y:1983 | 05 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $9,885 | $15,000 | Not Implemented |
GT0200 # 06 Y:1983 | 06 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $31,000 | $22,000 | Not Implemented |
GT0201 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,132 | $500 | Implemented |
GT0201 # 02 Y:1983 | 02 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,745 | $50,000 | Implemented |
GT0201 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $22,837 | $10,000 | Implemented |
GT0201 # 04 Y:1983 | 04 | 1983 | MODIFY DYE BECK | $58,597 | $101,000 | Implemented |
GT0201 # 05 Y:1983 | 05 | 1983 | MODIFY DYE BECK | $38,740 | $51,000 | Implemented |
GT0201 # 06 Y:1983 | 06 | 1983 | MODIFY TEXTILE DRYERS | $33,809 | $35,000 | Implemented |
GT0201 # 07 Y:1983 | 07 | 1983 | CONTROL PRESSURE ON STEAMER OPERATIONS | $7,770 | $3,500 | Implemented |
GT0201 # 08 Y:1983 | 08 | 1983 | REPAIR AND ELIMINATE STEAM LEAKS | $4,897 | $400 | Implemented |