Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0098 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $992 | $590 | Not Implemented |
UD0098 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,313 | $11,424 | Not Implemented |
UD0098 # 05 Y:1983 | 05 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,383 | $0 | Not Implemented |
UD0099 # 01 Y:1983 | 01 | 1983 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,571 | $10,000 | Not Implemented |
UD0099 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $9,454 | $4,000 | Not Implemented |
UD0099 # 03 Y:1983 | 03 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $633 | $0 | Not Implemented |
TN0177 # 01 Y:1983 | 01 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,055 | $1,170 | Not Implemented |
TN0177 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,540 | $400 | Implemented |
TN0177 # 03 Y:1983 | 03 | 1983 | USE MINIMUM STEAM OPERATING PRESSURE | $2,625 | $400 | Implemented |
TN0179 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $8,400 | $5,000 | Implemented |
TN0179 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $2,291 | $5,700 | Implemented |
TN0179 # 03 Y:1983 | 03 | 1983 | USE SOLAR HEAT TO HEAT WATER | $826 | $24,000 | Implemented |
GT0189 # 01 Y:1983 | 01 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,520 | $57,400 | Not Implemented |
GT0189 # 02 Y:1983 | 02 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $1,000 | Implemented |
GT0189 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,560 | $8,000 | Not Implemented |
GT0189 # 04 Y:1983 | 04 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,900 | $9,000 | Not Implemented |
GT0189 # 05 Y:1983 | 05 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,583 | $1,660 | Not Implemented |
GT0189 # 06 Y:1983 | 06 | 1983 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,380 | $25,200 | Not Implemented |
GT0189 # 07 Y:1983 | 07 | 1983 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $37,600 | $20,000 | Not Implemented |
GT0190 # 01 Y:1983 | 01 | 1983 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,525 | $29,000 | Not Implemented |
GT0190 # 02 Y:1983 | 02 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,244 | $94,000 | Not Implemented |
GT0190 # 03 Y:1983 | 03 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,468 | $9,000 | Implemented |
GT0190 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,821 | $6,500 | Not Implemented |
GT0190 # 05 Y:1983 | 05 | 1983 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,250 | $500 | Not Implemented |
GT0190 # 06 Y:1983 | 06 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $146 | $500 | Not Implemented |