Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,465
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0060 # 06 Y:2025 | 06 | 2025 | USE AUTOMATIC CLEANING EQUIPMENT | $44,873 | $110,000 | n/a |
MU0060 # 07 Y:2025 | 07 | 2025 | USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING | $1,733 | $5,000 | n/a |
MU0060 # 08 Y:2025 | 08 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,220 | $5,000 | n/a |
MU0060 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,407 | $66,000 | n/a |
MU0060 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,322 | $490,355 | n/a |
CI0037 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $74,767 | $25,940 | n/a |
CI0037 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,594 | $236,068 | n/a |
CI0037 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,579 | $1,600 | n/a |
CI0037 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $11,559 | $3,600 | n/a |
CI0037 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,720 | $13,500 | n/a |
CI0037 # 06 Y:2024 | 06 | 2024 | RECOVER AND REUSE WASTE MATERIAL | $7,648 | $8,750 | n/a |
CI0037 # 07 Y:2024 | 07 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,500 | $2,000 | n/a |
CI0037 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,373 | $50 | n/a |
CI0037 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $3,616 | $1,575 | n/a |
CI0037 # 10 Y:2024 | 10 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,495 | $36,000 | n/a |
CI0037 # 11 Y:2024 | 11 | 2024 | USE PHOTOCELL CONTROLS | $2,356 | $960 | n/a |
CI0037 # 12 Y:2024 | 12 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,140 | $860 | n/a |
CI0037 # 13 Y:2024 | 13 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,023 | $18,000 | n/a |
CI0037 # 14 Y:2024 | 14 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,215 | $740 | n/a |
AS0594 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $534,062 | $3,480,000 | n/a |
AS0594 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,609 | $18,624 | n/a |
AS0594 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $3,701 | $390 | n/a |
AS0594 # 04 Y:2024 | 04 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $915 | $3,003 | n/a |
LS2501 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,529 | $0 | n/a |
LS2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $90 | n/a |