IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0748 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $14,240 $17,670 Not Implemented
AM0748 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,300 $51,700 Implemented
AM0748 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,900 $18,200 Implemented
AM0748 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,425 $1,000 Implemented
AM0748 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,640 $0 Implemented
AM0748 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,020 $345 Implemented
AM0748 # 07 Y:2018 07 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $145 Implemented
AM0747 # 01 Y:2018 01 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $170,240 $376,350 Not Implemented
AM0747 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,800 $121,500 Implemented
AM0747 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,900 $44,160 Implemented
AM0747 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,800 $39,100 Implemented
AM0747 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,680 $30 Not Implemented
AM0746 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,600 $13,500 Implemented
AM0746 # 02 Y:2018 02 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,690 $4,570 Implemented
AM0746 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,310 $1,350 Implemented
AM0746 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,570 $13 Not Implemented
AM0746 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,460 $3,330 Not Implemented
AM0746 # 06 Y:2018 06 2018 PAY UTILITY BILLS ON TIME $2,256 $0 Implemented
AM0746 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,200 $890 Implemented
AM0746 # 08 Y:2018 08 2018 USE SYNTHETIC LUBRICANT $1,780 $0 Implemented
AM0746 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,795 $500 Implemented
AM0746 # 10 Y:2018 10 2018 USE PHOTOCELL CONTROLS $1,230 $625 Implemented
AM0746 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $540 $360 Not Implemented
AM0745 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $45,900 $0 Not Implemented
AM0745 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,800 $44,650 Not Implemented