IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0018 # 12 Y:2008 12 2008 REDUCE VENTILATION AIR $5,870 $0 Implemented
OR0531 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $2,818 $2,800 Not Implemented
OR0531 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $20,000 $87,500 Not Implemented
OR0531 # 03 Y:2008 03 2008 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $2,400 $0 Not Implemented
OR0531 # 04 Y:2008 04 2008 CLEAR AND RENT EXISTING SPACE $24,000 $0 Not Implemented
OR0531 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,266 $3,000 Not Implemented
SF0359 # 01 Y:2008 01 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,430 $0 Implemented
SF0359 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $870 $904 Implemented
SF0359 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,576 $523 Implemented
SF0359 # 04 Y:2008 04 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,314 $1,577 Implemented
SF0359 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,881 $6,200 Not Implemented
SF0359 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $453 Implemented
SF0359 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $929 $4,808 Implemented
SF0359 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $955 $6,455 Not Implemented
SF0359 # 09 Y:2008 09 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $40,974 $1,575,000 Not Implemented
MA0640 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $36,692 $39,000 Implemented
MA0640 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $11,811 $11,850 Implemented
MA0640 # 03 Y:2008 03 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,640 $43,000 Not Implemented
MA0640 # 04 Y:2008 04 2008 MINIMIZE WATER USAGE $4,210 $18,000 Not Implemented
MA0640 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,895 $3,000 Implemented
MA0640 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
MA0640 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $689 Implemented
IC0141 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,325 $6,000 Not Implemented
IC0141 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,733 $24,016 Implemented
IC0141 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $23,283 $37,500 Not Implemented