IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0050 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $24,897 $5,000 Implemented
MZ0050 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $6,000 Implemented
MZ0050 # 05 Y:2010 05 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $916 $1,000 Not Implemented
MZ0050 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,280 $0 Not Implemented
MZ0050 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $311 $1,250 Not Implemented
MZ0050 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $15,507 $0 Implemented
UF0433 # 01 Y:2010 01 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,771 $2,321 Not Implemented
UF0433 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $314 Implemented
UF0433 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $8,558 Not Implemented
UF0433 # 04 Y:2010 04 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $21,987 $10,000 Not Implemented
UF0433 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $0 Implemented
UF0433 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $621 $0 Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented
UF0433 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,722 $6,350 Not Implemented
UF0433 # 09 Y:2010 09 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,836 $4,000 Not Implemented
UF0433 # 10 Y:2010 10 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,885 $816 Implemented
MA0665 # 01 Y:2010 01 2010 UPGRADE CONTROLS ON COMPRESSORS $15,680 $58,600 Implemented
MA0665 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,642 $18,330 Implemented
MA0665 # 03 Y:2010 03 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,625 $2,000 Not Implemented
MA0665 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,470 $200 Implemented
MA0665 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,134 $3,150 Not Implemented
MA0665 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $480 Implemented
MA0665 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $155 $180 Implemented
IA0451 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $1,729 Implemented
IA0451 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,102 $1,000 Implemented