Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0050 # 03 Y:2010 | 03 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $24,897 | $5,000 | Implemented |
MZ0050 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $585 | $6,000 | Implemented |
MZ0050 # 05 Y:2010 | 05 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $916 | $1,000 | Not Implemented |
MZ0050 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,280 | $0 | Not Implemented |
MZ0050 # 07 Y:2010 | 07 | 2010 | INSTALL OCCUPANCY SENSORS | $311 | $1,250 | Not Implemented |
MZ0050 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,507 | $0 | Implemented |
UF0433 # 01 Y:2010 | 01 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,771 | $2,321 | Not Implemented |
UF0433 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,098 | $314 | Implemented |
UF0433 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,138 | $8,558 | Not Implemented |
UF0433 # 04 Y:2010 | 04 | 2010 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $21,987 | $10,000 | Not Implemented |
UF0433 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,205 | $0 | Implemented |
UF0433 # 06 Y:2010 | 06 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $621 | $0 | Implemented |
UF0433 # 07 Y:2010 | 07 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,610 | $0 | Implemented |
UF0433 # 08 Y:2010 | 08 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,722 | $6,350 | Not Implemented |
UF0433 # 09 Y:2010 | 09 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,836 | $4,000 | Not Implemented |
UF0433 # 10 Y:2010 | 10 | 2010 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $1,885 | $816 | Implemented |
MA0665 # 01 Y:2010 | 01 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $15,680 | $58,600 | Implemented |
MA0665 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,642 | $18,330 | Implemented |
MA0665 # 03 Y:2010 | 03 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,625 | $2,000 | Not Implemented |
MA0665 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,470 | $200 | Implemented |
MA0665 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $1,134 | $3,150 | Not Implemented |
MA0665 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,028 | $480 | Implemented |
MA0665 # 07 Y:2010 | 07 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $155 | $180 | Implemented |
IA0451 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $1,729 | Implemented |
IA0451 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,102 | $1,000 | Implemented |