Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164,550
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
KU0156 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $311 | $187 | Not Implemented |
KU0156 # 09 Y:1985 | 09 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $0 | Not Implemented |
KU0156 # 10 Y:1985 | 10 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Not Implemented |
KU0156 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $40 | Not Implemented |
OK0157 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $201 | Implemented |
OK0157 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $327 | $81 | Implemented |
OK0157 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $373 | $87 | Implemented |
OK0157 # 04 Y:1985 | 04 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $557 | $584 | Implemented |
OK0157 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,705 | $620 | Implemented |
OK0157 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $902 | $165 | Implemented |
OK0157 # 07 Y:1985 | 07 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $131 | $500 | Implemented |
CO0021 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $474 | $219 | Implemented |
CO0021 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $440 | $500 | Implemented |
CO0021 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $811 | $200 | Implemented |
CO0021 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $149 | $200 | Implemented |
CO0021 # 05 Y:1985 | 05 | 1985 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,675 | $0 | Implemented |
CO0021 # 06 Y:1985 | 06 | 1985 | REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES | $3,907 | $1,000 | Not Implemented |
CO0021 # 07 Y:1985 | 07 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $532 | $500 | Implemented |
CO0021 # 08 Y:1985 | 08 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $50 | Implemented |