IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0175 # 01 Y:1983 01 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,900 $12,800 Not Implemented
GT0175 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,860 $1,000 Not Implemented
GT0175 # 03 Y:1983 03 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,250 $2,200 Not Implemented
GT0175 # 04 Y:1983 04 1983 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $737 $1,451 Not Implemented
GT0175 # 05 Y:1983 05 1983 COVER OPEN TANKS $499 $900 Not Implemented
GT0176 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,340 $49,800 Not Implemented
GT0176 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,115 $9,830 Not Implemented
GT0176 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $928 $500 Not Implemented
GT0176 # 04 Y:1983 04 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $698 $50 Not Implemented
GT0176 # 05 Y:1983 05 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $293 $624 Not Implemented
GT0176 # 06 Y:1983 06 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $113 $250 Not Implemented
GT0178 # 01 Y:1983 01 1983 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $20,000 $15,950 Not Implemented
GT0178 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,360 $3,500 Not Implemented
GT0178 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,100 $2,300 Not Implemented
GT0178 # 04 Y:1983 04 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $735 $250 Not Implemented
GT0179 # 01 Y:1983 01 1983 CONTROL PRESSURE ON STEAMER OPERATIONS $165,000 $5,000 Not Implemented
GT0179 # 02 Y:1983 02 1983 MODIFY TEXTILE DRYERS $47,600 $5,000 Not Implemented
GT0179 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,700 $16,000 Not Implemented
GT0179 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,300 $1,000 Not Implemented
GT0179 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,350 $6,750 Not Implemented
GT0180 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,000 $62,500 Implemented
GT0180 # 02 Y:1983 02 1983 REDUCE GLAZED AREAS IN BUILDINGS $990 $350 Implemented
GT0180 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,220 $7,510 Implemented
GT0180 # 04 Y:1983 04 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,820 $24,800 Not Implemented
GT0181 # 01 Y:1983 01 1983 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $20,000 $28,000 Not Implemented