IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0735 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,821 $9,500 Not Implemented
OK0735 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,625 $4,000 Not Implemented
OK0735 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,193 $12,830 Not Implemented
OK0735 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,240 $700 Not Implemented
OK0733 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,333 $5,000 Not Implemented
OK0733 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $6,122 $13,600 Implemented
OK0733 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,003 $980 Implemented
OK0733 # 04 Y:2006 04 2006 $3,500 $0 Not Implemented
OK0733 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $9,738 Implemented
OK0733 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,460 $3,919 Implemented
OK0733 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $442 $1,360 Implemented
OK0731 # 01 Y:2006 01 2006 USE SOLAR HEAT FOR HEAT $97,944 $80,060 Not Implemented
OK0731 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,213 $0 Implemented
OK0731 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,514 $3,851 Not Implemented
OK0731 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $9,975 Not Implemented
OK0731 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,071 $3,949 Implemented
OK0731 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $727 Implemented
OK0731 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $68,849 Implemented
OK0730 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,533 $3,500 Implemented
OK0730 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $948 $158 Not Implemented
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,565 $8,601 Not Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
OK0730 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,839 $1,000 Not Implemented
OK0730 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $1,237 Implemented