IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0055 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,150 $3,200 Not Implemented
RU0055 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $31,000 $13,500 Not Implemented
RU0055 # 09 Y:1989 09 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,933 $0 Implemented
RU0055 # 10 Y:1989 10 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,364 $0 Implemented
RU0056 # 01 Y:1989 01 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $5,773 $10,000 Implemented
RU0056 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $664 $0 Implemented
RU0056 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,379 $2,500 Implemented
RU0056 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,020 $2,940 Not Implemented
TN0359 # 01 Y:1989 01 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,190 $900 Not Implemented
TN0359 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,741 $2,300 Implemented
TN0359 # 03 Y:1989 03 1989 CLOSE OFF UNNEEDED STEAM LINES $567 $0 Not Implemented
TN0359 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $2,150 Implemented
TN0359 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $-88 $0 Not Implemented
TN0359 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $144 Implemented
TN0359 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $147 $261 Not Implemented
TN0359 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $759 $1,800 Not Implemented
TN0359 # 09 Y:1989 09 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $143 $289 Not Implemented
TN0359 # 10 Y:1989 10 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $73 $40 Not Implemented
TN0360 # 01 Y:1989 01 1989 KEEP LAMPS AND REFLECTORS CLEAN $10,266 $24,045 Not Implemented
TN0360 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,620 $1,150 Implemented
TN0360 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $4,865 $1,211 Not Implemented
TN0360 # 04 Y:1989 04 1989 USE MINIMUM STEAM OPERATING PRESSURE $1,135 $0 Implemented
TN0360 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $600 Implemented
TN0360 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,685 $1,700 Implemented
TN0360 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $703 $0 Implemented