IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0141 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,139 $882 Implemented
LE0141 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,495 $7,000 Not Implemented
LE0141 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,311 $2,000 Not Implemented
LE0141 # 07 Y:2002 07 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,900 $30,000 Not Implemented
AS0332 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $909 $4,165 Implemented
AS0332 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $373 $1,050 Not Implemented
AS0332 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,133 $750 Not Implemented
AS0332 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $580 $1,750 Not Implemented
AS0332 # 05 Y:2002 05 2002 IMPROVE SPACE COMFORT CONDITIONING $75,184 $3,302 Not Implemented
UD0651 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $165,000 $0 Implemented
UD0651 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,254 $5,000 Implemented
UD0651 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,217 $0 Implemented
UD0651 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $19,136 $24,000 Implemented
UD0651 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,563 $51,600 Not Implemented
UD0651 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,418 $12,200 Not Implemented
UD0651 # 07 Y:2002 07 2002 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $7,528 $0 Implemented
UD0651 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $5,833 $1,125 Implemented
UD0651 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $751 $1,737 Implemented
UD0651 # 10 Y:2002 10 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $313 $0 Implemented
SU0139 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $602,817 $2,180,000 Not Implemented
SU0139 # 02 Y:2002 02 2002 RECOVER AND REUSE WASTE MATERIAL $22,050 $8,000 Not Implemented
SU0139 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,623 $2,160 Implemented
SU0139 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $8,410 $0 Not Implemented
SU0139 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,261 $11,724 Not Implemented
SU0139 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,799 $0 Not Implemented