IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0520 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,563 $136 Implemented
SF0520 # 04 Y:2018 04 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $4,469 $4,039 Implemented
SF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,296 $8,179 Implemented
SF0520 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $942 $900 Implemented
SF0520 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,938 $24,858 Implemented
SF0520 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $82,569 $631,513 Not Implemented
SF0520 # 09 Y:2018 09 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,289 $953 Implemented
GT0913 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $15,944 $624 Not Implemented
GT0913 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $29,561 $5,341 Not Implemented
GT0913 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $41,820 $8,622 Not Implemented
GT0913 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,508 $93,857 Not Implemented
GT0913 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,257 $68,584 Not Implemented
GT0913 # 06 Y:2018 06 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $42,029 $79,672 Not Implemented
GT0913 # 07 Y:2018 07 2018 USE SOLAR HEAT FOR HEAT $77,046 $500,799 Not Implemented
SD0564 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $17,517 $86,400 Implemented
SD0564 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $27,785 Not Implemented
SD0564 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,302 $2,468 Not Implemented
SD0564 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $1,676 $2,046 Not Implemented
SD0564 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $973 $400 Not Implemented
AS0454 # 01 Y:2018 01 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $274,952 $196,499 Not Implemented
AS0454 # 02 Y:2018 02 2018 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $64,677 $0 Not Implemented
AS0454 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,697 $12,185 Not Implemented
AS0454 # 04 Y:2018 04 2018 USE LESS WASTEFUL PACKAGING $12,596 $196 Not Implemented
AS0454 # 05 Y:2018 05 2018 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $11,530 $150 Not Implemented
AS0454 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $4,026 $3,043 Not Implemented