Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0781 # 03 Y:2008 | 03 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $6,695 | $2,100 | Not Implemented |
UD0781 # 04 Y:2008 | 04 | 2008 | OPTIMIZE PLANT POWER FACTOR | $6,559 | $9,000 | Implemented |
UD0781 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $0 | Not Implemented |
UD0781 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $0 | Implemented |
UD0781 # 07 Y:2008 | 07 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,508 | $5,000 | Implemented |
UD0781 # 08 Y:2008 | 08 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,162 | $2,800 | Implemented |
UD0781 # 09 Y:2008 | 09 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $2,146 | $1,068 | Implemented |
UD0781 # 10 Y:2008 | 10 | 2008 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,794 | $0 | Implemented |
UD0781 # 11 Y:2008 | 11 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $800 | $0 | Implemented |
UD0778 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $77,393 | $80,770 | Not Implemented |
UD0778 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,780 | $12,000 | Not Implemented |
UD0778 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,222 | $22,560 | Not Implemented |
UD0778 # 04 Y:2008 | 04 | 2008 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $5,905 | $18,000 | Not Implemented |
UD0778 # 05 Y:2008 | 05 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $3,783 | $0 | Not Implemented |
UD0778 # 06 Y:2008 | 06 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,431 | $6,000 | Not Implemented |
UD0778 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,176 | $0 | Implemented |
UD0778 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,563 | $6,075 | Implemented |
UD0778 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,692 | $5,992 | Not Implemented |
UD0778 # 10 Y:2008 | 10 | 2008 | INSTALL OCCUPANCY SENSORS | $1,683 | $4,305 | Implemented |
UD0778 # 11 Y:2008 | 11 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,302 | $0 | Not Implemented |
UD0778 # 12 Y:2008 | 12 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $853 | $310 | Not Implemented |
UD0778 # 13 Y:2008 | 13 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $45 | $0 | Not Implemented |
UD0773 # 01 Y:2008 | 01 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $79,805 | $20,000 | Implemented |
UD0773 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $32,919 | $21,000 | Not Implemented |
UD0773 # 03 Y:2008 | 03 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $22,200 | $15,000 | Implemented |