Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0407 # 01 Y:2010 | 01 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,128 | $60,000 | Implemented |
NC0407 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $35,567 | $200,000 | Not Implemented |
NC0407 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $1,000 | Implemented |
NC0407 # 04 Y:2010 | 04 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,147 | $42,000 | Implemented |
NC0407 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $50 | Not Implemented |
NC0407 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $6,897 | Implemented |
NC0411 # 01 Y:2010 | 01 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,139 | $5,000 | Implemented |
NC0411 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $15,453 | $30,000 | Not Implemented |
NC0411 # 03 Y:2010 | 03 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,708 | $500 | Implemented |
NC0411 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,307 | $100 | Implemented |
NC0411 # 05 Y:2010 | 05 | 2010 | USE POWER DURING OFF-PEAK PERIODS | $400 | $100 | Implemented |
NC0405 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $227 | $200 | Implemented |
NC0405 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $100 | Implemented |
NC0405 # 03 Y:2010 | 03 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $1,096 | $4,858 | Not Implemented |
NC0405 # 04 Y:2010 | 04 | 2010 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $31,421 | $0 | Not Implemented |
NC0402 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,787 | $0 | Not Implemented |
NC0402 # 02 Y:2010 | 02 | 2010 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $3,632 | $14,000 | Implemented |
NC0402 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $497 | $100 | Implemented |
NC0402 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $0 | Implemented |
NC0402 # 05 Y:2010 | 05 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $1,454 | Implemented |
NC0402 # 06 Y:2010 | 06 | 2010 | COVER OPEN TANKS | $3,253 | $0 | Not Implemented |
NC0401 # 01 Y:2010 | 01 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,744 | $3,600 | Implemented |
NC0401 # 02 Y:2010 | 02 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,833 | $0 | Implemented |
NC0401 # 03 Y:2010 | 03 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,578 | $0 | Implemented |
NC0401 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,940 | $7,800 | Implemented |