IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0407 # 01 Y:2010 01 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,128 $60,000 Implemented
NC0407 # 02 Y:2010 02 2010 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $35,567 $200,000 Not Implemented
NC0407 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $1,000 Implemented
NC0407 # 04 Y:2010 04 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,147 $42,000 Implemented
NC0407 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $50 Not Implemented
NC0407 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $6,897 Implemented
NC0411 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,139 $5,000 Implemented
NC0411 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $15,453 $30,000 Not Implemented
NC0411 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,708 $500 Implemented
NC0411 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $100 Implemented
NC0411 # 05 Y:2010 05 2010 USE POWER DURING OFF-PEAK PERIODS $400 $100 Implemented
NC0405 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $227 $200 Implemented
NC0405 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $100 Implemented
NC0405 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $1,096 $4,858 Not Implemented
NC0405 # 04 Y:2010 04 2010 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $31,421 $0 Not Implemented
NC0402 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,787 $0 Not Implemented
NC0402 # 02 Y:2010 02 2010 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $3,632 $14,000 Implemented
NC0402 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $100 Implemented
NC0402 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,982 $0 Implemented
NC0402 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $445 $1,454 Implemented
NC0402 # 06 Y:2010 06 2010 COVER OPEN TANKS $3,253 $0 Not Implemented
NC0401 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,744 $3,600 Implemented
NC0401 # 02 Y:2010 02 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,833 $0 Implemented
NC0401 # 03 Y:2010 03 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,578 $0 Implemented
NC0401 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,940 $7,800 Implemented