Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0743 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $21,613 | $2,450 | Implemented |
OK0743 # 06 Y:2007 | 06 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $24,607 | $0 | Not Implemented |
OK0743 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $5,413 | $723 | Implemented |
OK0741 # 01 Y:2007 | 01 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $144,120 | $500,000 | Not Implemented |
OK0741 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,666 | $860 | Not Implemented |
OK0741 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,334 | $7,480 | Not Implemented |
OK0741 # 04 Y:2007 | 04 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,042 | $6,800 | Not Implemented |
OK0741 # 05 Y:2007 | 05 | 2007 | INSTALL SET-BACK TIMERS | $273 | $248 | Not Implemented |
OK0739 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,798 | $9,750 | Implemented |
OK0739 # 02 Y:2006 | 02 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,872 | $2,175,000 | Not Implemented |
OK0739 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $139,230 | $39,852 | Not Implemented |
OK0739 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,011 | $390 | Not Implemented |
OK0739 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,090 | $7,944 | Implemented |
OK0739 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,587 | $191 | Implemented |
OK0739 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,734 | $9,485 | Not Implemented |
OK0737 # 01 Y:2006 | 01 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $22,707 | $1,420 | Not Implemented |
OK0737 # 02 Y:2006 | 02 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $7,798 | $11,625 | Not Implemented |
OK0737 # 03 Y:2006 | 03 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $92,687 | $1,025 | Not Implemented |
OK0737 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $30,440 | $19,260 | Not Implemented |
OK0737 # 05 Y:2006 | 05 | 2006 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $28,248 | $15,000 | Not Implemented |
OK0735 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $69,788 | $55,933 | Not Implemented |
OK0735 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,821 | $9,500 | Not Implemented |
OK0735 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,625 | $4,000 | Not Implemented |
OK0735 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,193 | $12,830 | Not Implemented |
OK0735 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,240 | $700 | Not Implemented |