Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0955 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $319 | $1,000 | Not Implemented |
UD0955 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,363 | $21,980 | Not Implemented |
UD0955 # 09 Y:2016 | 09 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $3,109 | $9,840 | Not Implemented |
UD0955 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,366 | $23,200 | Not Implemented |
WV0532 # 01 Y:2016 | 01 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $35,091 | $2,025 | Not Implemented |
WV0532 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,778 | $25,000 | Not Implemented |
WV0532 # 03 Y:2016 | 03 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $7,492 | $18,550 | Not Implemented |
WV0532 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,128 | $0 | Implemented |
WV0532 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,095 | $730 | Implemented |
WV0532 # 06 Y:2016 | 06 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,845 | $2,675 | Implemented |
WV0532 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,284 | $552 | Implemented |
WV0532 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $884 | $158 | Implemented |
WV0532 # 09 Y:2016 | 09 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $806 | $235 | Implemented |
WV0532 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $811 | $0 | Implemented |
WV0532 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $796 | $795 | Implemented |
WV0532 # 12 Y:2016 | 12 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $530 | $2,500 | Not Implemented |
WV0532 # 13 Y:2016 | 13 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $25 | Implemented |
WV0531 # 01 Y:2016 | 01 | 2016 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $19,064 | $33,000 | Not Implemented |
WV0531 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,039 | $63,000 | Not Implemented |
WV0531 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $12,371 | $25,305 | Implemented |
WV0531 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,464 | $4,100 | Implemented |
WV0531 # 05 Y:2016 | 05 | 2016 | INSTALL SET-BACK TIMERS | $4,942 | $0 | Implemented |
WV0531 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,891 | $8,624 | Implemented |
WV0531 # 07 Y:2016 | 07 | 2016 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $2,730 | $2,795 | Not Implemented |
WV0531 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,225 | $4,010 | Implemented |