IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0275 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $147 Implemented
IA0275 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,724 $10,962 Not Implemented
IA0275 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,769 $700 Implemented
IA0275 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,919 $0 Implemented
IA0275 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,067 $0 Implemented
IA0275 # 08 Y:2001 08 2001 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $722 $496 Implemented
IA0275 # 09 Y:2001 09 2001 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $21 $100 Not Implemented
IA0275 # 10 Y:2001 10 2001 $57,330 $21,000 n/a
OR0393 # 01 Y:2001 01 2001 $100,000 $15,300 n/a
OR0393 # 02 Y:2001 02 2001 ELIMINATE/REDUCE AN OPERATION $1,120,240 $662,000 n/a
OR0393 # 03 Y:2001 03 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,734 $1,500 n/a
OR0393 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,247 $17,800 n/a
OR0393 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,716 $26,090 n/a
MI0019 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,022 $10,000 n/a
MI0019 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 n/a
MI0019 # 03 Y:2001 03 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $8,400 $2,000 n/a
MI0019 # 04 Y:2001 04 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,290 $2,530 n/a
MI0019 # 05 Y:2001 05 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,266 $14,000 n/a
MI0019 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,991 $288 n/a
UF0277 # 11 Y:2001 11 2001 REPAIR OR REPLACE STEAM TRAPS $2,712 $0 Implemented
UF0277 # 12 Y:2001 12 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,600 $0 Not Implemented
UF0277 # 13 Y:2001 13 2001 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $7,281 $0 Implemented
UF0277 # 14 Y:2001 14 2001 $7,280 $0 Not Implemented
UF0277 # 15 Y:2001 15 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $540,000 $0 Not Implemented
UF0277 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,104 $0 Implemented