Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0139 # 07 Y:2002 | 07 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,266 | $16,600 | Not Implemented |
SU0139 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,186 | $138 | Implemented |
SU0139 # 09 Y:2002 | 09 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,611 | $570 | Not Implemented |
SD0302 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,323 | $34,000 | Not Implemented |
SD0302 # 02 Y:2002 | 02 | 2002 | INSTALL SKYLIGHTS | $6,262 | $2,000 | Not Implemented |
SD0302 # 03 Y:2002 | 03 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,968 | $12,000 | Not Implemented |
SD0302 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,228 | $0 | Not Implemented |
SD0302 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $964 | $800 | Not Implemented |
SD0302 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,000 | $10,000 | Not Implemented |
SD0302 # 07 Y:2002 | 07 | 2002 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $5,210 | $6,000 | Not Implemented |
SD0302 # 08 Y:2002 | 08 | 2002 | PAY UTILITY BILLS ON TIME | $427 | $0 | Implemented |
WV0246 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $600 | Not Implemented |
WV0246 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $249 | $0 | Implemented |
WV0246 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,539 | $0 | Implemented |
WV0246 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,277 | $240 | Implemented |
WV0246 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,200 | $400 | Implemented |
WV0246 # 06 Y:2002 | 06 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,264 | $2,255 | Not Implemented |
WV0246 # 07 Y:2002 | 07 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $621 | $1,140 | Not Implemented |
WV0246 # 08 Y:2002 | 08 | 2002 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $787 | $1,300 | Not Implemented |
WV0246 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $3,472 | $2,563 | Implemented |
WV0246 # 10 Y:2002 | 10 | 2002 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $458 | $830 | Implemented |
WV0246 # 11 Y:2002 | 11 | 2002 | RECOVER AND REUSE COOLING WATER | $5,769 | $5,000 | Not Implemented |
WV0246 # 12 Y:2002 | 12 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,301 | $0 | Implemented |
OK0642 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,760 | $9,780 | Implemented |
OK0642 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,120 | $900 | Implemented |