IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0505 # 01 Y:2017 01 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $23,294 $4,639 Not Implemented
SF0505 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $86 Not Implemented
SF0505 # 03 Y:2017 03 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,070 $1,651 Not Implemented
SF0505 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,325 $6,323 Not Implemented
SF0505 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,816 $6,103 Not Implemented
SF0505 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,675 $28,219 Not Implemented
SF0505 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,828 $5,423 Implemented
SF0505 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $1,069 $1,882 Implemented
UU0119 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,742 $3,975 Not Implemented
UU0119 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $4,431 $4,250 Not Implemented
UU0119 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,428 $0 Not Implemented
UU0119 # 04 Y:2017 04 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,918 $0 Not Implemented
UU0119 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,903 $2,472 Implemented
UU0119 # 06 Y:2017 06 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,324 $3,000 Not Implemented
UU0119 # 07 Y:2017 07 2017 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,100 $0 Not Implemented
UU0119 # 08 Y:2017 08 2017 COMBINE UTILITY METERS $657 $1,125 Not Implemented
UU0119 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $127 $240 Implemented
MZ0236 # 01 Y:2017 01 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,789 $1,000 Implemented
MZ0236 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,401 $1,650 Implemented
MZ0236 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,327 $175 Implemented
MZ0236 # 04 Y:2017 04 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,559 $846 Not Implemented
MZ0236 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $323 $746 Implemented
MZ0237 # 01 Y:2017 01 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,793 $0 Implemented
MZ0237 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $262 $800 Not Implemented
MZ0237 # 03 Y:2017 03 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,548 $0 Not Implemented