IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0773 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $16,500 $30,000 Not Implemented
UD0773 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,532 $9,125 Not Implemented
UD0773 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,125 $26,824 Not Implemented
UD0773 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,990 $0 Implemented
UD0773 # 08 Y:2008 08 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,322 $500 Not Implemented
UD0773 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,733 $0 Not Implemented
UD0769 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $126,798 $0 Implemented
UD0769 # 02 Y:2007 02 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $119,000 $0 Implemented
UD0769 # 03 Y:2007 03 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $63,509 $110,000 Implemented
UD0769 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,170 $110,000 Implemented
UD0769 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $44,667 $28,125 Implemented
UD0769 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,200 $130,000 Implemented
UD0769 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $25,268 $0 Implemented
UD0769 # 08 Y:2007 08 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $23,200 $400 Implemented
UD0769 # 09 Y:2007 09 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $13,400 $600 Not Implemented
UD0769 # 10 Y:2007 10 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,000 $25,000 Not Implemented
UD0769 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,569 $3,275 Implemented
UD0769 # 12 Y:2007 12 2007 REDUCE VENTILATION AIR $17,703 $26,910 Not Implemented
UD0769 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $3,980 $0 Implemented
UD0769 # 14 Y:2007 14 2007 REDUCE VENTILATION AIR $2,208 $590 Implemented
UD0769 # 15 Y:2007 15 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,800 $500 Implemented
UD0769 # 16 Y:2007 16 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,447 $520 Implemented
UD0769 # 17 Y:2007 17 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,242 $0 Implemented
TT0013 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $60,000 $180,000 Not Implemented
TT0013 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,410 $10,550 Not Implemented