IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0391 # 05 Y:2001 05 2001 INSTALL COMMON HEADER ON COMPRESSORS $2,248 $6,400 Not Implemented
OR0389 # 01 Y:2001 01 2001 MODIFY CURRENT INCENTIVE PROGRAM $289,800 $26,680 Implemented
OR0389 # 02 Y:2001 02 2001 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $29,980 $20,000 Implemented
OR0389 # 03 Y:2001 03 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,790 $4,721 Implemented
OR0389 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,384 $3,000 Implemented
OR0389 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,103 $590 Implemented
OR0388 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $187,500 $18,000 Implemented
OR0388 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $290,325 $250,000 Implemented
OR0388 # 03 Y:2001 03 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,900 $60,000 Implemented
OR0388 # 04 Y:2001 04 2001 MODIFY CURRENT INCENTIVE PROGRAM $368,300 $29,120 Implemented
OR0388 # 05 Y:2001 05 2001 COMBINE UTILITY METERS $1,079 $3,000 Not Implemented
OR0388 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $0 Not Implemented
OR0387 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $176,000 $5,000 Implemented
OR0387 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $440,800 $128,700 Implemented
OR0387 # 03 Y:2001 03 2001 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $324,800 $138,000 Not Implemented
OR0387 # 04 Y:2001 04 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $373,000 $580,000 Not Implemented
OR0387 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $57,000 $74,000 Implemented
OR0387 # 06 Y:2001 06 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,800 $5,850 Implemented
OR0387 # 07 Y:2001 07 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,400 $5,400 Not Implemented
OR0387 # 08 Y:2001 08 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,885 $300 Implemented
OR0387 # 09 Y:2001 09 2001 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $2,320 $0 Implemented
OR0385 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $670 $1,900 Not Implemented
OR0385 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,638 $10,431 Implemented
OR0385 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $10,600 $58,000 Not Implemented
OR0385 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $9,076 $12,220 Not Implemented