IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0272 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,861 $440 Implemented
TN0272 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $576 $448 Implemented
TN0273 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $61,908 $4,200 Implemented
TN0273 # 02 Y:1986 02 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,336 $79,000 Not Implemented
TN0273 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,635 $2,800 Implemented
TN0273 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,293 $1,680 Implemented
TN0273 # 05 Y:1986 05 1986 HEAT WATER WITH EXHAUST HEAT $1,562 $7,200 Not Implemented
TN0273 # 06 Y:1986 06 1986 USE MINIMUM STEAM OPERATING PRESSURE $1,249 $0 Not Implemented
TN0273 # 07 Y:1986 07 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $787 $87 Not Implemented
TN0274 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $890 $0 Not Implemented
TN0274 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $366 $400 Not Implemented
TN0274 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $297 $500 Not Implemented
TN0274 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $227 $0 Implemented
TS0033 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,881 $2,730 Not Implemented
TS0033 # 02 Y:1986 02 1986 USE OPTIMUM THICKNESS INSULATION $1,345 $2,730 Not Implemented
TS0033 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,996 $178 Not Implemented
TS0033 # 04 Y:1986 04 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,601 $0 Not Implemented
TS0033 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,451 $1,000 Not Implemented
TS0033 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $922 $1,300 Not Implemented
LT0051 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,015 $0 Implemented
LT0051 # 02 Y:1986 02 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $1,452 $0 Implemented
LT0051 # 03 Y:1986 03 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,811 $8,000 Not Implemented
LT0051 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $848 $140 Implemented
LT0051 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $1,025 $113 Implemented
LT0051 # 06 Y:1986 06 1986 OPTIMIZE PLANT POWER FACTOR $12,627 $7,140 Not Implemented