IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0501 # 05 Y:1996 05 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,186 $0 Not Implemented
UD0501 # 06 Y:1996 06 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,826 $200 Not Implemented
UF0161 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,316 $7,288 Not Implemented
UF0161 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $6,951 Implemented
UF0161 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $546 $500 Not Implemented
UF0161 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,132 $1,000 Implemented
UF0161 # 05 Y:1996 05 1996 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,171 $7,500 Not Implemented
UF0161 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $816 $865 Not Implemented
UF0161 # 07 Y:1996 07 1996 $11,375 $7,000 Implemented
TN0595 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $34,060 $12,880 Implemented
TN0595 # 02 Y:1996 02 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $33,550 $15,600 Not Implemented
TN0595 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $9,770 $5,400 Implemented
TN0595 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,230 $7,525 Implemented
TN0595 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,660 $480 Not Implemented
TN0595 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,920 $4,450 Not Implemented
TN0595 # 07 Y:1996 07 1996 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $2,600 $0 Implemented
TN0595 # 08 Y:1996 08 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,600 $930 Not Implemented
WI0278 # 01 Y:1996 01 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $141,768 $412,500 Not Implemented
WI0278 # 02 Y:1996 02 1996 INSTALL SET-BACK TIMERS $15,919 $2,400 Implemented
WI0278 # 03 Y:1996 03 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,230 $500 Implemented
WI0278 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,105 $11,072 Not Implemented
WI0278 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,241 $1,786 Not Implemented
WI0278 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $5,933 $1,000 Implemented
WI0278 # 07 Y:1996 07 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $5,818 $0 Implemented
WI0278 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $505 Not Implemented