IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0238 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $730 Implemented
SU0238 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $86 $127 Implemented
SU0238 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $684 Not Implemented
SU0238 # 12 Y:2006 12 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,004 $67,500 Not Implemented
TA0117 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,020 $7,980 Implemented
TA0117 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,208 $5,065 Implemented
TA0117 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $9 Implemented
TA0117 # 04 Y:2006 04 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $478 $0 Implemented
TA0117 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $2,356 $0 Implemented
TA0117 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,290 $22,980 Not Implemented
BD0315 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $12,408 $12,368 Not Implemented
BD0315 # 02 Y:2006 02 2006 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $10,595 $900 Not Implemented
BD0315 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $13,074 $16,950 Not Implemented
BD0315 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,730 $3,356 Not Implemented
BD0315 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,369 $750 Implemented
BD0315 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,167 $7,043 Not Implemented
BD0315 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $379 Implemented
BD0315 # 08 Y:2006 08 2006 USE SYNTHETIC LUBRICANT $1,246 $2,000 Not Implemented
BD0315 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $0 Not Implemented
BD0315 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $588 $1,050 Not Implemented
BD0315 # 11 Y:2006 11 2006 AUTOMATE PAYROLL SYSTEM $10,530 $7,000 Not Implemented
UD0743 # 01 Y:2006 01 2006 ADD AREA LIGHTING SWITCHES $206,125 $12,880 Not Implemented
UD0743 # 02 Y:2006 02 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $10,000 Not Implemented
UD0743 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,904 $33,000 Not Implemented
UD0743 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,086 $100,000 Not Implemented