Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0054 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,010 | $7,000 | Implemented |
UA0054 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $86,265 | $71,625 | Not Implemented |
UA0054 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $2,443 | $1,893 | Not Implemented |
UA0054 # 05 Y:2010 | 05 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $42,638 | $40,400 | Not Implemented |
UA0054 # 06 Y:2010 | 06 | 2010 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $25,338 | $6,850 | Not Implemented |
UA0054 # 07 Y:2010 | 07 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $4,372 | $3,230 | Implemented |
MI0192 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,080 | $32,395 | Implemented |
MI0192 # 02 Y:2010 | 02 | 2010 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $39,832 | $41,440 | Not Implemented |
MI0192 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $37,971 | $1,020 | Implemented |
MI0192 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,844 | $1,210 | Implemented |
MI0192 # 05 Y:2010 | 05 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $19,608 | $35,500 | Not Implemented |
MI0192 # 06 Y:2010 | 06 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,417 | $1,020 | Implemented |
MI0192 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,898 | $40 | Implemented |
MI0192 # 08 Y:2010 | 08 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,732 | $4,531 | Not Implemented |
MI0192 # 09 Y:2010 | 09 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,176 | $9,650 | Implemented |
SD0428 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,812 | $400 | Implemented |
SD0428 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $900 | $49 | Not Implemented |
SD0428 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,585 | $11,320 | Not Implemented |
SD0428 # 04 Y:2010 | 04 | 2010 | INCREASE USE OF AUTOMATION | $3,390 | $6,200 | Not Implemented |
SD0428 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,796 | $15,635 | Not Implemented |
SD0428 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $265 | $777 | Not Implemented |
OR0557 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,806 | $14,882 | Not Implemented |
OR0557 # 02 Y:2010 | 02 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,866 | $6,763 | Not Implemented |
OR0557 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,416 | $500 | Not Implemented |
OR0557 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $3,858 | Not Implemented |