IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented
GT0927 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,141 $1,725,000 Not Implemented
GT0927 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $62,369 $548,847 Not Implemented
OK1014 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,926 $9,064 Implemented
OK1014 # 02 Y:2019 02 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,114 $3,878 Implemented
OK1014 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,017 $1,750 Implemented
OK1013 # 05 Y:2019 05 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $264,923 $206,847 Not Implemented
OK1013 # 06 Y:2019 06 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,999 $4,520 Implemented
OK1013 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,284 $4,982 Implemented
OK1013 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $14,945 $0 Not Implemented
OK1013 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,608 $35,153 Implemented
OK1013 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,610 $6,480 Not Implemented
LE0478 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $2,876 $0 Not Implemented
LE0478 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $667 $60 Not Implemented
LE0478 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $11,891 $9,000 Not Implemented
LE0478 # 04 Y:2019 04 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $39,339 $85,000 Not Implemented
LE0478 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $450 Not Implemented
LE0478 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $9,000 Not Implemented
MI0354 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,517 $105,476 Implemented
MI0354 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,459 $80,434 Implemented
MI0354 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $12,789 $3,600 Implemented
MI0354 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,262 $29,820 Not Implemented
MI0354 # 05 Y:2019 05 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,590 $8,800 Implemented
MI0354 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $2,156 $2,559 Implemented
MI0354 # 07 Y:2019 07 2019 AIR CONDITION ONLY SPACE NECESSARY $1,687 $240 Implemented