Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0328 # 10 Y:2007 | 10 | 2007 | INSULATE BARE EQUIPMENT | $1,625 | $1,238 | Implemented |
UM0328 # 11 Y:2007 | 11 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,083 | $1,350 | Not Implemented |
UM0328 # 12 Y:2007 | 12 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $515 | $1,000 | Not Implemented |
UM0328 # 13 Y:2007 | 13 | 2007 | INSULATE BARE EQUIPMENT | $493 | $307 | Not Implemented |
UM0327 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,123 | $9,375 | Implemented |
UM0327 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,136 | $9,406 | Not Implemented |
UM0327 # 03 Y:2007 | 03 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $9,041 | $6,735 | Not Implemented |
UM0327 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,637 | $2,140 | Not Implemented |
UM0327 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,516 | $1,000 | Implemented |
UM0327 # 06 Y:2007 | 06 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,955 | $787 | Not Implemented |
UM0327 # 07 Y:2007 | 07 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $981 | $1,000 | Not Implemented |
UM0327 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $561 | $275 | Implemented |
UM0327 # 09 Y:2007 | 09 | 2007 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $416 | $780 | Not Implemented |
UM0326 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,782 | $1,000 | Not Implemented |
UM0326 # 02 Y:2007 | 02 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $8,825 | $13,130 | Implemented |
UM0326 # 03 Y:2007 | 03 | 2007 | COVER OPEN TANKS | $4,631 | $220 | Implemented |
UM0326 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,591 | $500 | Implemented |
UM0326 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,234 | $675 | Implemented |
UM0326 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,191 | $1,860 | Implemented |
UM0326 # 07 Y:2007 | 07 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,476 | $2,200 | Implemented |
UM0326 # 08 Y:2007 | 08 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,092 | $204 | Implemented |
UM0326 # 09 Y:2007 | 09 | 2007 | INSTALL OCCUPANCY SENSORS | $253 | $600 | Implemented |
UM0325 # 01 Y:2007 | 01 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $56,621 | $14,400 | Implemented |
UM0325 # 02 Y:2007 | 02 | 2007 | REDUCE VENTILATION AIR | $22,071 | $17,000 | Not Implemented |
UM0325 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,908 | $3,000 | Not Implemented |