Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,515
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0096 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,369 | $40 | Implemented |
OD0096 # 06 Y:1997 | 06 | 1997 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $24,828 | $34,068 | Not Implemented |
OD0096 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,950 | $1,495 | Implemented |
OD0096 # 08 Y:1997 | 08 | 1997 | ADOPT IN-HOUSE MATERIAL GENERATION | $936,000 | $1,000,000 | Implemented |
OD0095 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,962 | $8,508 | Not Implemented |
OD0095 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $171 | $289 | Not Implemented |
OD0095 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,935 | $2,025 | Not Implemented |
OD0095 # 04 Y:1997 | 04 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,126 | $0 | Not Implemented |
NC0128 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $92 | $140 | Not Implemented |
NC0128 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $445 | $1,260 | Not Implemented |
NC0128 # 03 Y:1997 | 03 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $799 | $700 | Not Implemented |
NC0128 # 04 Y:1997 | 04 | 1997 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $28,209 | $17,238 | Not Implemented |
NC0128 # 05 Y:1997 | 05 | 1997 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $18,878 | $49,000 | Not Implemented |
NC0128 # 06 Y:1997 | 06 | 1997 | INSULATE BARE EQUIPMENT | $1,956 | $3,655 | Implemented |
NC0128 # 07 Y:1997 | 07 | 1997 | AIR CONDITION ONLY SPACE NECESSARY | $3,389 | $7,155 | Not Implemented |
NC0128 # 08 Y:1997 | 08 | 1997 | OPERATE BOILERS ON HIGH FIRE SETTING | $19,152 | $2,000 | Implemented |
NC0128 # 09 Y:1997 | 09 | 1997 | REDUCE SCRAP PRODUCTION | $1,288 | $250 | Not Implemented |
NC0128 # 10 Y:1997 | 10 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $96 | $4,200 | Implemented |
NC0128 # 11 Y:1997 | 11 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $140,000 | $300,000 | Implemented |
OD0094 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,901 | $24,756 | Implemented |
OD0094 # 02 Y:1997 | 02 | 1997 | USE PHOTOCELL CONTROLS | $543 | $778 | Implemented |
OD0094 # 03 Y:1997 | 03 | 1997 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $23,023 | $75,016 | Not Implemented |
NC0123 # 01 Y:1997 | 01 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,987 | $0 | Implemented |
NC0123 # 02 Y:1997 | 02 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $953 | $450 | Not Implemented |
NC0123 # 03 Y:1997 | 03 | 1997 | ADD AREA LIGHTING SWITCHES | $1,475 | $2,000 | Not Implemented |